Check the water circuit and the circuit is correct before booting.
The boot sequence is:
1 Turn on the line power and turn on the key switch. At this point the machine ventilation and cooling system power, the current meter shows a value of about 7A;
2 Wait for 5 to 10 seconds. Press the trigger button on the external control panel. The current meter displays a value of zero. After 3 to 5 seconds, the xenon lamp ignites and the ammeter displays the value 7A.
3 Turn on the galvanometer power supply;
4 Turn on the computer and call up the required marking file;
5 adjust the laser power to the operating current (10 ~ 18A), you can start marking;
After the marking is completed, turn off the power to the components in reverse order as described above:
1 The laser power supply operating current is minimized (about 7A);
2 shut down the computer;
3 close the galvanometer power supply;
4 Press the stop button;
5 close the key switch;
6 Disconnect the incoming power.